Skip to main content
All articles

Quality & Delivery

How to Approve a New Lot of Rayon Embroidery Thread

Zhijin / All4LacePublished
Original process diagram of alternating cones on one head. A, B1 and B2 are identifiers. No test results are shown.

If a new lot of the same viscose rayon thread series and colour starts breaking more often, pause its use and compare it with a retained, approved cone. Stitch the same design on the same machine head, logging each confirmed upper-thread break and the stitches actually worked. The comparison helps the buyer decide whether to investigate the cone, the head or a recurring point in the design before releasing the lot.

Label the approved cone and the incoming lot

Find the retained cone and stitch-out from the approval record. Check the maker, thread series, size, colour number, supplier lot and package type, then label each cone used in the trial. A maker may offer several sizes and packages within one rayon range. Visual colour alone is a poor way to match the cones. Log any package damage and retain the labels and suspect cones for review.

Change only the upper thread for the first comparison

Have the operator verify the threading path, needle and thread contact points under the equipment instructions. Use the same head, file revision, ground lot, backing, bobbin thread specification and settings. Alternate the approved cone A and incoming cone B. If the first incoming cone shows a problem, try a second cone from the same delivery lot. Log any setting change as a separate trial. Thread construction and finish affect running behaviour. Needle selection, tension, speed and design can also contribute to breaks.

Count actual stitches and confirmed upper-thread breaks

For each confirmed unplanned upper-thread break, record the head, cone, motif position and approximate stitch index. Log planned colour changes, empty bobbins and stops with an uncertain cause separately. If the actual stitches worked by that head in the monitored upper thread are known, divide confirmed breaks by those stitches and multiply by 10,000. If a run stops early and the completed count cannot be verified, record the raw break count and stopping point. Repeat that run before comparing rates.

Use the comparison to decide what to investigate

In this hypothetical example, A1, B1, A2 and B2 run in that order on one head. Each trial completes 10,000 monitored stitches. A1 and A2 use one approved cone. B1 and B2 use separate cones from the same incoming lot.

Use the comparison to decide what to investigate
Cones and runsConfirmed upper-thread breaksActual stitchesBreaks per 10,000 stitches
Approved cone A, runs A1 and A20 + 120,0000.5
Incoming lot, cones B1 and B23 + 420,0003.5

The pattern warrants holding the incoming lot for review. If a second checked head is needed, repeat the comparison with the approved cone and the suspect cones. Record whether the issue follows the suspect cones. If it occurs with approved and incoming cones at the same head or the same design point, investigate the head or motif before repeating the comparison. The example illustrates the calculation and the decision to investigate. Agree the acceptance criteria for the actual order.

Keep lab results and production trials separate

If the yarn itself needs checking, ask the lab about the agreed ISO 2062:2009 method for single-end breaking force and elongation at break of yarn from packages. Tie the report to the cones and lots submitted. The stitch-out separately records how the identified thread behaved on the selected design and machine setup. A tensile result and a stitch-out answer different questions for the same lot.

Record which lot is cleared for use

Identify the incoming lot, cones tested and production already affected. Retain the approved cone, suspect cones, labels and stitch-outs. Have buying and quality staff record what remains on hold and what may be used under the approved conditions. Specify the lot and repeat checks when requesting replacement. Recheck relevant parts of the trial when the lot, design file, head or production conditions change.

Discuss your embroidery project

For finished embroidered fabric, share the approved sample reference, motif file revision and required evaluation when you discuss the next order.

Contact Zhijin

Continue reading